"Former Names: Marine Midland Arena (1996-1999) | Construction Cost: $127-Million USD | Architect: Ellerbe Beckett | Average Ticket Price: $36.43 | Capacity: 18,690"
Hockey
· Buffalo, United States
8.8"Former Names: Ohio University's Athletic Plant (1929-1946) | Surface: Field Turf | Construction Cost: $ 185,000 USD | Architect: Osborn Engineering | Capacity: 24,000"
Football
· Athens, United States
"Surface: Field Turf | Construction Cost: $1.34-Million USD | Architect: Howard D. Smith | Capacity: 102,329"
Football
· Columbus, United States
"Former Names: Pilot Field (1988-1994), Downtown Ballpark (1994), Dunn Tire Park (1998-2008) | Surface: Natural Grass | Dimensions: 325 ft (Left), 404 ft (Center), 325 ft (Right) | Capacity: 18,025"
Baseball
· Buffalo, United States
8.6"Former Names: Rich Stadium (1973-1998) | Surface: Astroturf | Construction Cost: $22-Million | USD Architect: HNTB | Capacity: 73,079"
Football
· Orchard Park, United States
8.8